The planned dates for the Port Orleans Riverside Ol' Man Island pool closure are now set as 11 January 2016 to 4 March 2016 . This includes the main and children's pools, the hot tub and the Muddy Rivers pool bar - but the campfire, kids' playground, fishing hole and through-route walkways will remain open. This work could potentially run a little longer, but that's the most accurate information I have at present.
Also, construction work on the new Port Orleans French Quarter children's water play area is running slightly behind schedule due to some permitting issues, and it is now scheduled to open on 19 January 2016.
Also, construction work on the new Port Orleans French Quarter children's water play area is running slightly behind schedule due to some permitting issues, and it is now scheduled to open on 19 January 2016.
Re: POR and POFQ pool area maintenance updates
Andre -
I sent a couple pictures of the work being done at the FQ pool area to the dropbox. Not sure what to do with them from there...
Feel free to post them up wherever appropriate.
I sent a couple pictures of the work being done at the FQ pool area to the dropbox. Not sure what to do with them from there...
Feel free to post them up wherever appropriate.
Re: POR and POFQ pool area maintenance updates
I would love to see the photos. 

Re: POR and POFQ pool area maintenance updates
I'm going to pop them into a news roundup post too, but here are some POFQ children's water play area construction pics, taken on 4 December. Thanks for the upload, Joe:





Andre





Andre

- The Unofficial Visitor's Guide to the Port Orleans Resorts in Orlando, Florida -
-
- Posts: 1
- Joined: December 28th, 2015, 10:23 am
Re: POR and POFQ pool area maintenance updates
I have a trip planned for March 1. I called about the pool,and I was told that it would be done by March 1st. I was wondering if this is correct. I don't want to stay at a resort without a pool.
Re: POR and POFQ pool area maintenance updates
specialedteacher wrote:I have a trip planned for March 1. I called about the pool,and I was told that it would be done by March 1st. I was wondering if this is correct. I don't want to stay at a resort without a pool.
I assume you are talking about the Riverside pool? The most recent date I've been given for completion is 4 March, but that could change of course (which could be either way, but in my experience these things more often end up taking longer than planned rather than shorter).
There are still five other pools at the resort though (plus the one at French Quarter), and many guests seem to prefer the more local quieter pools rather than the main pool (my daughter does for one).