Refurbishment Work

Unread post by reggs15 »

Hello, We will be staying in one of the Royal Rooms at PORS in May. I see that they will be doing work on the roof of the "Magnolia" bldg. Has this been a noise problem for anyone who has stayed on this side of the property? I know my daughter wants to stay in the Royal Room but there are still rooms available on the other side of the resort. If we want to take a nap before heading out to the parks I'm worried the noise from work being done will keep us from getting rest.
User avatar
Admin
Site Admin
Posts: 2094
Joined: September 11th, 2008, 6:44 am
Contact:

Re: Refurbishment Work

Unread post by Admin »

There isn't any work occurring in either of the two Royal buildings (Oak Manor and Parterre Place), just in the next mansion building along (Magnolia Terrace). If you switched to a regular room (rather than Royal) there is always a chance that you might be located in Magnolia Terrace itself, so I'd suggest leaving your booking as it is.

The only way to 100% guarantee to be very far away from the roofing work would be to book a Preferred Location room, which would ensure you get a room in the Alligator Bayou lodges rather than in the mansion buildings at all.

But as I said, I really wouldn't worry about it and stick with what you've got.

Andre
Image
- The Unofficial Visitor's Guide to the Port Orleans Resorts in Orlando, Florida -
Godalejrbud8
Posts: 20
Joined: February 27th, 2016, 12:51 pm

Re: Refurbishment Work

Unread post by Godalejrbud8 »

Admin wrote:There isn't any work occurring in either of the two Royal buildings (Oak Manor and Parterre Place), just in the next mansion building along (Magnolia Terrace). If you switched to a regular room (rather than Royal) there is always a chance that you might be located in Magnolia Terrace itself, so I'd suggest leaving your booking as it is.

The only way to 100% guarantee to be very far away from the roofing work would be to book a Preferred Location room, which would ensure you get a room in the Alligator Bayou lodges rather than in the mansion buildings at all.

But as I said, I really wouldn't worry about it and stick with what you've got.

Andre
I was going to request a room in building 85 for its proximity to the lobby. I have a king room booked. I know that's where they are scheduled to be working but was thinking it shouldn't be a problem. Should I think otherwise? We are arriving April 27th. Thanks Andre!
reggs15
Posts: 3
Joined: April 13th, 2016, 12:28 pm

Re: Refurbishment Work

Unread post by reggs15 »

I do not think the rooms are available for Bldg 85 as they are currently working on the roof.
Godalejrbud8
Posts: 20
Joined: February 27th, 2016, 12:51 pm

Re: Refurbishment Work

Unread post by Godalejrbud8 »

reggs15 wrote:I do not think the rooms are available for Bldg 85 as they are currently working on the roof.
From what I've read, they do have a section off limits, but who knows. Proximity is important here at Riverside. I guess time will tell. I agree with Andre, I don't think the noise will bother you in a royal room, but I'm not there yet. Good luck and thanks for you're input!
User avatar
Admin
Site Admin
Posts: 2094
Joined: September 11th, 2008, 6:44 am
Contact:

Re: Refurbishment Work

Unread post by Admin »

The roofing work on building 85 (Magnolia Terrace) is being undertaken block by block, starting with the central block (which is now complete) and then doing the four separate wings one by one. The rest of the sections of the building that are not being worked on remain open for guest accommodation.

Andre
Image
- The Unofficial Visitor's Guide to the Port Orleans Resorts in Orlando, Florida -
Godalejrbud8
Posts: 20
Joined: February 27th, 2016, 12:51 pm

Re: Refurbishment Work

Unread post by Godalejrbud8 »

Admin wrote:The roofing work on building 85 (Magnolia Terrace) is being undertaken block by block, starting with the central block (which is now complete) and then doing the four separate wings one by one. The rest of the sections of the building that are not being worked on remain open for guest accommodation.

Andre
That's what I thought. I'm going to send the fax 5 days before. Thank you!
Godalejrbud8
Posts: 20
Joined: February 27th, 2016, 12:51 pm

Re: Refurbishment Work

Unread post by Godalejrbud8 »

reggs15, my wife and I just returned from POR and stayed in Acadia House. I didn't hear any noise during the day anywhere in Magnolia Bend. We walked by a few different times at different times of the day. The only thing I saw was the scaffolding. I would imagine you booked your room by now, but just FYI.
reggs15
Posts: 3
Joined: April 13th, 2016, 12:28 pm

Re: Refurbishment Work

Unread post by reggs15 »

Godalejrbud8 wrote:reggs15, my wife and I just returned from POR and stayed in Acadia House. I didn't hear any noise during the day anywhere in Magnolia Bend. We walked by a few different times at different times of the day. The only thing I saw was the scaffolding. I would imagine you booked your room by now, but just FYI.

Thank you! Yes, we have requested to stay in the Oak Bldg. Only 17 more days until our vacation. Any tips???
Godalejrbud8
Posts: 20
Joined: February 27th, 2016, 12:51 pm

Re: Refurbishment Work

Unread post by Godalejrbud8 »

reggs15 wrote:
Godalejrbud8 wrote:reggs15, my wife and I just returned from POR and stayed in Acadia House. I didn't hear any noise during the day anywhere in Magnolia Bend. We walked by a few different times at different times of the day. The only thing I saw was the scaffolding. I would imagine you booked your room by now, but just FYI.

Thank you! Yes, we have requested to stay in the Oak Bldg. Only 17 more days until our vacation. Any tips???
I wrote a lengthy trip report, had a good stay.. The parks were more crowded that any trip in the past but still managed to do all we wanted. I would recommend getting to the parks at rope drop to take advantage of popular attractions. Extra magic hours in the morning were great to get a jump on things. Have a great time!
mlwinans
Posts: 1
Joined: May 2nd, 2016, 3:51 pm

Re: Refurbishment Work

Unread post by mlwinans »

Is there any update to work being done on building 85? I paid no attention to the refurbishment Page and requested a Room in that building (we booked a King Room).
User avatar
MardiGroggy
Posts: 290
Joined: August 11th, 2013, 10:30 am
Location: North Florida

Re: Refurbishment Work

Unread post by MardiGroggy »

How soon are you going to be there, mlwinans? I'll be there in a couple of weeks and will stroll over to Magnolia to check on progress. In any case, if they assign you a room in Magnolia, you won't be in the section where the roof work is being done, but you may see the scaffolding.
MardiGroggy
Aka: Steve

"Laissez les bons temps rouler!"
Post Reply